Friday, July 21, 2006

Remodelling to commence

This morning the materials for the room arrived from Lowes. And the dumpster for the garbage were both there before I left for work.

The only missing materials was the fanfold stuff to go under the siding to help keep the house slightly more insulated. That will be delivered shortly the driver assured me.

Now I need to get some before pictures taken so I can put them online later.